The correct specification, size and technology of generator is key to a reliable UPS, generator, IT system. If the generator is in any way upset by the non linear waveforms created by these electronic loads it will shut down to protect itself. If the system is not designed from the load back to the generator unreliability will exist in the system.
One of the most common problems that operators of data centres find is to do with generators being undersized for their duty, or being unsettled by the complex load waveforms that the UPS and / or IT load produce.
“Substantial quantities of the generator surveys that we undertake highlight the poor specification and wrong sizing of critical power generators. The correct design is not as complex as it first seems but the correct assessment of the load is critical"
Powertechnix can provide a design lead turn key service to ensure that you can have confidence in your UPS and generator system.